ATEX, IECEx and the North American Class/Division system all describe the same physics, but they are not interchangeable paperwork. Which one you need is decided by where the equipment is being installed — and buying the wrong certificate is a common and expensive way to fail an inspection.

The confusion usually starts because the technical standards underneath are now largely the same. The difference is in the approval route, the marking, and who accepts what.

The three systems at a glance

ATEX IECEx North America (Class/Division & Zone)
Region European Union International (IEC member countries) United States and Canada
Legal basis Directive 2014/34/EU, mandatory for the EU market Voluntary international certification system National Electrical Code (NEC) and Canadian Electrical Code
Technical standards EN 60079 series IEC 60079 series UL, FM and CSA standards, derived from the same physics
Marking CE plus the Ex hexagon, e.g. II 2 G Ex db IIC T6 Gb Ex db IIC T6 Gb, with an IECEx certificate number Listing mark from UL, FM or CSA with class, division or zone
Issued by EU Notified Body Approved IECEx Certification Body (ExCB) Nationally Recognised Testing Laboratory

ATEX: two directives, not one

ATEX is often spoken about as a single thing, but the name covers two separate directives, and buyers regularly mix them up.

  • Directive 2014/34/EU is the equipment directive. It applies to the manufacturer, and it is why a product carries the CE mark and the Ex hexagon. It replaced the older 94/9/EC.
  • Directive 1999/92/EC is the workplace directive, sometimes called ATEX 137. It applies to the user, and it is the obligation to classify areas, select suitable equipment and manage the installation.

The equipment marking adds the ATEX category ahead of the IEC-style string. Categories map to zones for gas:

ATEX category Permitted zones Comparable EPL
1 G Zone 0, 1 and 2 Ga
2 G Zone 1 and 2 Gb
3 G Zone 2 Gc

So II 2 G Ex db IIC T6 Gb reads as: equipment group II (surface industry), category 2 (Zone 1 and 2), for gas, following the Ex marking that says flameproof, group IIC, T6, EPL Gb.

The United Kingdom is a separate case since Brexit. Equipment for the UK market follows the UKEX scheme and carries UKCA marking rather than CE. Many manufacturers hold both, but they are not the same certificate. If your project is in the UK, ask for the UKEX certificate specifically.

IECEx: international, and increasingly the default

IECEx is not a law. It is a certification system run by the IEC, in which approved certification bodies issue certificates against the IEC 60079 series. Its value is that the certificate is internationally recognised and, crucially, publicly verifiable.

The IECEx system also extends beyond equipment: there are schemes for service facilities and for certified persons, which matters when a plant requires a documented competence trail for hazardous-area work.

The practical advantages for a project are:

  • one certificate accepted as evidence in many countries, reducing repeated testing;
  • a public certificate register, so an inspector or buyer can check authenticity directly;
  • a common technical basis with ATEX, since both rest on the IEC 60079 series.

Some countries accept IECEx directly; others use it as a fast track into a local approval. That is why most export-oriented manufacturers carry IECEx and ATEX together and add local approvals where they matter commercially.

North America: two parallel systems

The United States and Canada historically use a Class and Division system, and the NEC also permits an alternative Zone system that aligns with IEC practice.

System Division / Zone Where it applies
Class I, Division 1 Hazardous atmosphere present under normal conditions Roughly comparable to Zone 1
Class I, Division 2 Present only under abnormal conditions Roughly comparable to Zone 2
Class II Combustible dust Dust environments
Class III Ignitable fibres and flyings Textile and similar plants
Class I, Zone 0 / 1 / 2 NEC Article 505 alternative Uses IEC-style protection concepts

Equipment must be listed or approved by a recognised body such as UL, FM or CSA for the specific class, division or zone. A CE-marked ATEX product is not automatically accepted in the United States, and an IECEx certificate on its own does not make it acceptable either.

The mapping between Division 1 and Zone 1 is often described as “roughly equivalent”, and that word matters. They are different schemes with different test regimes and different marking conventions. If your project is in North America, state it at the enquiry stage.

Local approvals that sit on top

Beyond the three main systems, many markets require a national approval before equipment can be imported or installed. These are commercially decisive but are often discovered late.

Market What is commonly required
European Union ATEX equipment directive, CE marking
United Kingdom UKEX scheme, UKCA marking
India PESO approval
Brazil INMETRO certification
Russia and Eurasian Economic Union EAC certification under the customs union technical regulation on equipment for explosive atmospheres
China Domestic Ex certification for equipment placed on the Chinese market
Saudi Arabia and much of the Gulf IECEx or ATEX as the technical basis, plus national import approval
Australia and New Zealand IECEx widely accepted, with the local regulatory mark

Treat this table as a starting point, not a legal opinion: the requirement is set by the local authority, and it changes. Confirm with your importer or the authority before the order is placed rather than after the container lands.

Why a manufacturer holds both ATEX and IECEx

For the buyer, a dual-certified product is a sign that the test programme was run once against a standard that satisfies two systems. It usually means the same hardware is acceptable across more projects, which simplifies spares, and it removes the risk of a project being supplied against a certificate the end user’s inspector will not accept.

It does not mean the two certificates are identical documents, or that one proves the other. Both should be produced on request. Our own documentation is listed on the quality and certifications page.

What to write into a purchase specification

  1. The installation country, and the market the equipment must be approved for.
  2. The area classification: zone, group, temperature class, ambient range.
  3. The certification system required — ATEX, IECEx, UKEX, UL listing, or a national approval.
  4. A requirement to supply the certificate itself, with its number and issuing body, for the exact model quoted.
  5. A requirement that the certificate be verifiable in the issuing system’s public register.

Point 4 is the one worth insisting on. A datasheet statement that the range is “certified to ATEX” tells you nothing about whether the specific variant you are buying is covered. See how to verify an explosion-proof certificate for the checking procedure.

Common questions

Is IECEx accepted in Europe instead of ATEX?

No. For equipment placed on the EU market, the ATEX equipment directive is mandatory and the product must carry CE marking. An IECEx certificate is useful technical evidence and can support the assessment, but it does not replace the ATEX route.

Is ATEX accepted in the United States?

Not on its own. Hazardous-location equipment for the US market must be listed or approved by a recognised body for the applicable class, division or zone under the NEC.

Can one product carry ATEX and IECEx at the same time?

Yes, and it is common. Both certificates describe the same equipment against the same IEC 60079 protection concepts, issued through different systems. Ask for each certificate separately.

Where can I check whether an IECEx certificate is real?

Issued IECEx certificates, reports and licences are public and searchable in the IECEx On-Line Certification System. The system itself is described at iecex.com.

Tell us the installation country and we will tell you which approvals apply. Send the destination, the area classification and the equipment list — we will confirm the certification needed before you commit to a specification.

Request a quote ›

Send Us Your Inquiry Today

You are one step away from getting the best factory price and certified explosion-proof solutions. Tell us your requirements, and you will receive a reply within 24 hours.

What you get when you send an inquiry:

  • ✓Reply within 24 hoursReal technical engineer, not auto-responder.
  • ✓Factory direct priceNo middleman markup. EXW / FOB / CIF.
  • ✓Certified Ex-proof CustomizationATEX/IECEx standards, material, IP rating — tailored to your hazardous zones.
🔒 PrivacyYour information stays private

Kept confidential and never shared with third parties.

WhatsAppPrefer quick chat?

Talk with us on WhatsApp instead.

WhatsApp Us →
+ Free quoteTakes ~60 seconds

Tell us about your project

The more details you provide, the more accurate your quotation will be.

✓ No spam   ✓ 100% confidential   ✓ Free, no obligation

Start your project with a reliable China explosion-proof equipment factory today.
Scroll to Top
Get Quote